Our Services

Movement & Deformation Monitoring

Ground Monitoring

It is required especially for Underground activities.

Deep Excavation

To use auto operated Total Station to shot target at Walls of Excatation

Loop Closing

Loop closing error shouldn’t be more then 2mm otherwise need to repeat

Safety

Any unusual behavior displayed by the structure may threaten its safety

Live Sheet Update/Review

“All equipment is working online, and update the sheet every minute.”

Ground Monitoring with Closing Loop

We utilized Digital Level (Auto Staff Reading) and Total Station equipment for monitoring purposes, providing us with high accuracy within 2-3 seconds. This allowed us to monitor ground movements and land collapses and helped protect us from significant incidents for underground and shore/port projects. We have undertaken several monitoring projects, including the Red Line Metro in Qatar and Duqm Port in Oman.

foundations, Deformation & Permeation.

Flood control structures such as dams, locks, levees, and embankments are exposed to external loads that cause both the structure’s and its foundations’ deformation and permeation. Any unusual behavior displayed by the structure may threaten its safety. Therefore, it is essential to carefully monitor the loads placed on the structure and its response to them. Doing so can assist in identifying any abnormal behavior of the structure and can help to ensure its safety.

Latest Projects

Collombey Switzer-land

More Info

We have completed a plant Modeling for Collombey. It was a quite big project which been modeled in 13 Months with the help of our great software’s & great teams.The client fully satisfied from our 3D intelligent model. We have generated Isometric drawing for them so they can use after relocation. Also we did match marking for them. Also our UK team the one who did scanning over there. We took 56 days to finish to whole scanning. we have completed the project with high quality & committed time.

Engro-Karachi-Pakistan

More Info

Our team just completed an As-built Plant Modelling Project for the Engro plant. The project involved creating isometric drawings,equipment and piping plans, structural plans, electrical and instrumentation plans, material take-off, piping support details, a PMS pipe material specification chart/table, and various reports per the client’s requirements.

Jebeli Ali Plant-Dubai

More Info

In today’s age, plant modelling has become increasingly necessary. If you want to modify, you need an exact plant model perfectly aligned with geo-referencing. Accuracy is crucial when modelling on-site or on a computer. To ensure accuracy, we installed a large plant geo-referenced control monument along the road and covered each block with four controls to prevent the model from moving or rotating. Our client required the same as a previous project, an as-built 3D intelligent model, and we are experts in this field. Our client was satisfied with our work.